
Services required : Supply & InstallThe client is looking for : To have just an idea of the priceNumber of rooms (total) : 3Job start date : Within a yearJob description : We have a split level HMO flat in central Edinburgh. In order to remain HMO compliant we have been told we need to install a sprinkler system in the upper floor of the flat. There are 3 bedrooms, a bathroom and a hall upstairs. Downstairs there is a kitchen, lounge, bedroom and showerroom - but we have been told the sprinkler system is not required downstairs. ...
Number of rooms (total) : more than 5Job start date : Date not setServices required : Supply & InstallProperty type : House (RESIDENTIAL CARE SERVICE for five residents)The client is looking for : To get quotes and a contractor to do the work ...
Job description : Looking at sprinkler or misting systems for flat on top floor (HMO requirement) currently use aqua mist but service is very poorThe client is looking for : To have just an idea of the priceProperty type : Flat, apartmentServices required : Supply & Install ...
The client is looking for : To have just an idea of the priceProperty type : Other (HMO - hostel and 4 adjacent small flats)Services required : Supply & InstallJob start date : Less than six monthsNumber of rooms (total) : more than 5Job description : Council owned unoccupied hostel that from the outside looks like a short terrace of four 2 storey houses. The Council are very keen to sell the building to us: Bethany Christian Trust and have agreed to do so (and want us to take possession in October 2009) Building Control want us to install a sprinkler system to comply with current regulations. We plan to make alterations to form a hostel for 4 residents with 11 ground floor rooms and 4 1st floor rooms, and move on accommodation with one 2 bedroom ground floor flat (4 rooms) and three 1st floor single bedroom flats (each with 2 rooms). In total: 15 rooms on ground floor and 11 1st floor rooms plus shorer rooms/ toilets. There is a 400 gallon galvanised cold water tank in the attic at present but only a tank for 100 gallond will be required for domestic water .
Services required : Supply & InstallNumber of rooms (total) : more than 5Job description : Double-upper maisonette flat. Lounge, kitchen, 5 bedrooms, flat is on third floor so I have been advised that a water tank may be required as the mains water pressure may not be enough at this height. ...
Services required : Supply & InstallProperty type : Flat, apartmentThe client is looking for : To have just an idea of the priceJob start date : Less than two monthsJob description : to have a system in place to comply with HMO regulations for upper two storrey flat with 7 bedrooms, living room and kitchen. ...